Total Industrial Flow Control Solution: Valves, Steel Pipe, Flanges, Pipe Fittings, and more.  13:05:23 -0400
Industry News
Gulf Keystone commences drilling
Posted: 06/04/2012 11:06:03   Edited: 06/05/2012 11:06:03  Clicks: 3525
Gulf Keystone reported that the Bakrman-1 exploration well spudded on the Akri-Bijeel block in the Kurdistan Region of Iraq.

Bakrman-1, the third exploration well to be drilled on the Akri-Bijeel block, is located 32km to the north-west of the Bijell-1 discovery well and 25km to the north-west of the Aqra-1 appraisal well, which is currently being drilled to appraise the Bijell discovery.

The well is part of the operator's extensive exploration and appraisal program, which also includes the drilling of the Gulak-1 exploration well and three additional appraisal wells (Bijell-2, Qalati-1 and Qandagul-1). Bakrman-1 will target prospective intervals in the Jurassic, with a planned total depth of approximately 3,600m in the Lower Jurassic.
Contact Us
Mr. Alex Xu
Tel: 86-523-88631080 Fax: 86-523-86887879
Email: sales007@orientsteel.cn
  
     
Forged Steel Ball ValvesForged Steel Ball ValvesDownload Forged Steel Ball Valves PDF
Seamless Carbon Steel PipeSeamless Carbon Steel PipeDownload Seamless Carbon Steel Pipe PDF
Stainless Steel WN FlangeStainless Steel WN FlangeDownload Stainless Steel WN Flange PDF